A utilities contractor operating in Edmonton had been engaged to complete water main repair work along a commercial street, with the scope of work requiring excavation of a trench running parallel to the roadway and extending partially across the adjacent public sidewalk. The trench measured approximately 1.8 metres deep and 1.2 metres wide, positioned to access underground infrastructure while maintaining vehicular traffic flow on the street itself. The contractor's crew worked through the afternoon and, at approximately 4:30 PM, the site supervisor made the decision to cease operations for the day, with work scheduled to resume the following morning.

Before departing, workers placed 2 orange traffic cones at either end of the excavation and strung a single strand of yellow caution tape across the opening. No rigid barriers surrounded the trench, no warning signage had been posted to alert pedestrians, and no plywood or steel covering was placed over the excavation where it crossed the sidewalk. The site remained in this condition overnight, with the trench fully open and accessible to anyone walking along the pedestrian pathway.

The following morning, a 62-year-old retiree was walking along the sidewalk on a route she had used regularly for years, returning from an early medical appointment. The pedestrian's attention was momentarily drawn to her phone, which displayed directions to a nearby pharmacy, as she approached the construction zone. At approximately 8:45 AM, she stepped directly into the uncovered trench, falling the full depth of the excavation. During the fall, she struck her head against a protruding pipe fitting and landed awkwardly on her left leg and hip.

Emergency services transported the injured pedestrian to hospital, where medical examination revealed a fractured pelvis, a dislocated shoulder, multiple contusions, and a severe concussion. The injuries required surgical intervention followed by an extended course of physiotherapy projected to last approximately 8 months. The pedestrian incurred significant medical expenses, lost the ability to perform activities she had previously enjoyed, and experienced ongoing pain and mobility limitations.

The injured pedestrian now seeks compensation from the contractor, alleging that the failure to properly secure the excavation site constituted negligence. The contractor's liability insurer has retained counsel to defend the claim. Central to the dispute are questions about what obligations the contractor owed to pedestrians using the adjacent sidewalk, whether the precautions taken before leaving the site met the standard of care expected of a reasonable contractor in similar circumstances, whether the contractor's conduct actually caused the injuries sustained, what categories of loss are compensable, and whether the pedestrian's own conduct in using her phone while walking should reduce or eliminate any recovery.

Calculating Damages and Applying Defences in the Trench Injury Claim

On a crisp October morning in Edmonton, Marjorie Chen, a sixty-two-year-old retired accountant, was walking along the sidewalk on 124th Street when she encountered an area where Westbrook Construction Ltd. had been installing new water lines for a commercial development. The construction crew had excavated a trench approximately six feet deep and four feet wide that ran perpendicular to the sidewalk, and although work had ceased for the day at 4:30 PM the previous afternoon, no barriers, warning signs, or covering had been placed over the opening. Marjorie, who was returning from an early morning medical appointment and whose attention was momentarily drawn to her phone displaying directions to a nearby pharmacy, stepped directly into the uncovered trench at approximately 8:45 AM. She fell the full depth of the excavation, striking her head against a protruding pipe and landing awkwardly on her left leg and hip. Witnesses called emergency services, and Marjorie was transported to the University of Alberta Hospital, where imaging revealed a comminuted fracture of her left femur, a displaced fracture of her left hip requiring total hip arthroplasty, a moderate traumatic brain injury, and multiple contusions and lacerations across her body. Having already established in previous analysis that Westbrook Construction owed Marjorie a duty of care as a foreseeable pedestrian, that leaving the trench uncovered constituted a breach of the standard of care expected of reasonable contractors, and that the breach caused both the fall and the resulting injuries, the critical remaining questions involve quantifying the compensable losses Marjorie has suffered and examining whether any defences available to the contractor might reduce or eliminate its liability.